Company news

  • 23.05.2011 Installation of springboard K-65 metal constructions in mountain ski complex «Snezhinka» (Tchaikovsky, Perm region) is finished. » Read
  • 20.05.2011 Installation of stair-lift complex of mountain ski complex «Snezhinka» (Tchaikovsky, Perm region) is finished. » Read
  • 07.04.2011 Installation of springboard K-65 volume blocks in mountain ski complex «Snezhinka» (Tchaikovsky, Perm region) is completed on 50%. » Read
  • 29.03.2011 Installation of stair-lift complex in mountain ski complex «Snezhinka» (Tchaikovsky, Perm region) has begun. » Read


Projects of typical constructions

Fitness club with swimming pool

 

Multifunctional fitness center

 

Multifunctional fitness center with well-developed infrastructure of cultural-mass character

Main » Products and Services » Development » Multifunctional fitness center with well-developed infrastructure of cultural-mass character

BASIC TECHNICAL AND ECONOMIC INDICATORS OF THE BUILDING

  • The area of working (sports) space is 4510 sq m
  • The area of technical premises and back rooms is 1178 sq m
  • The area of ??public premises is 2588 sq m
  • Total area is 8254 sq m
  • The total area of ??the constructed hotel (6 floors) is 2280 sq m
  • Carrying capacity (sportsmen) 298 persons / shift
  • The maximum number of seats is 640 spectators
  • 2 volleyball courts, a basketball court, a playground for mini football, 4 universal gym, a gym, a hotel
 
Photo gallery
Exterior
Exterior
Top view
Top view
The plan from the top
The plan from the top